Meanwhile in The Hague Hollands Spoor station

The new lift construction was recently built in the nationally listed station building The Hague HS. This is an important step towards making platform 1 fully accessible.

In addition to the elevator shaft, the ‘shell construction’ of the new platform stairs is also almost completed and the finishing work can begin.

 

In the passenger tunnel and the station hall, the spaces are starting to take shape and the new passages provide a good and clear connection.

A new floor at Hollands Spoor

The station hall and passenger tunnel of The Hague Hollands Spoor will get new floor tiles.

The same gray terrazzo tile was chosen as in the newly realized part of the passenger tunnel on the Laakhaven side. This creates an coherent image in terms of floor finish throughout the entire route from the station square to the entrance at Laakhaven. There will be a different pattern in the station hall because the station hall is a substantially different space than the passenger tunnel due to its spacious proportions and great height.