Entries by Jordi Wenselaar

Authentic shutters return to railway station Deventer

The Deventer Industrial Heritage Foundation (SIED) is busy reconstructing the window shutters that used to hang on the station building in Deventer. At the request of NS Stations, Ruland Architects advised in the preliminary phase. With the help of very involved volunteers, the shutters were produced in a local carpentry factory. The painting is almost […]

SRAL 35 years – In relation to restoration

Ruland Architects congratulates Stichting Restauratie Atelier Limburg (SRAL) on their 35th anniversary. SRAL organized a symposium on this occasion: SRAL 35 – In relation to restoration. We were treated to interesting lectures about the full breadth of the restoration profession in which SRAL is active. This was followed by a tour of the studio in […]

Renovation of railway station in full swing

The renovation of railway station Roermond is well underway. The beautiful ceilings and constructions have been restored and on the outside the painter has started painting all the woodwork in the original colors. A lot of effort is being made to prepare the building for future use. A great moment for Omroep ML5 (Stichting Omroep […]

Roermond station building can be experienced in full height again

Disturbing elements in the Roermond station building have been removed with great care, making the original architecture of the building visible again. One of the interventions was the removal of the lowered ceilings. The original beautiful stucco ceilings and wood constructions can now be viewed in their full height again. A preview of the great […]

Renovation of the Roermond station building has started

The station building from 1881 is being renovated and rebuilt according to a design by Ruland Architects. The passage from the bus square to the station will be restored and the main entrance will be restored to its former glory. In addition, there will be a StationsHuiskamer and the florist will be given a new […]

Delivered in 2021

Ruland Architecten delivered a wide range of projects in 2021. Varying from small renovations of station waiting rooms to the major restoration of Maastricht station. As an end-of-year report, a festive collage of the special results. We wish you happy holidays and a prosperous 2022!

Festive opening of Maastricht station

Today Maastricht Station is officially and festively opened. After a thorough restoration, a treasure chest full of special details, materials, colors and historical elements has been restored to its former glory. Ruland Architecten is very proud of the achieved results. NS Stations has placed QR codes at the ‘Treasures of the station’ for visitors. In […]

Restoration of façade in Apeldoorn

Part of the facade of the Apeldoorn station building was heavily damaged after an ‘explosive raid’ on an ATM. Ruland Architecten has been asked to design the restoration of the facade and to provide the necessary permits.

Newsletter october 2021

In the working method of Ruland Architecten, we investigate the essence of the design. We respond to this in a new design for existing buildings: what are we getting back, what are we going to strengthen? It goes without saying that we look beyond the request.   Dutch language only.