The station building of Zwolle station was built in 1868 by the Maatschappij tot Exploitatie Staatsspoorwegen (MESS). It is a particularly well-preserved example of a ‘Station der 1e Klasse’, matching the important Zwolle railway junction. The building therefore has the status of a national monument. A challenging custom redevelopment project for Ruland Architects.
Ruland Architecten was commissioned by NS Stations to make the appropriate design for the redevelopment of the station building. The reason was the development of the railzone by the municipality of Zwolle and NS Stations. Within this development the role of the station building as a link in the passenger’s route is diminishing. A new interpretation of the monumental station building was sought, which had almost been given a subordinate position on the station square.
In addition, major renovations over the years have completely eroded the original interior. These adjustments now appear dated, inefficient and disordered. A clear structure and routing was missing. The current, non-original frame layouts are messy and detract from the characterful historic building. The challenge for Ruland Architects is to design a new, meaningful interior that does justice to the status of a national monument and ensures a matching appearance with the station square.
A re-branching of the functions has been achieved in collaboration with the NS Retail department and Ruland Architecten has taken a number of steps in the new design. Most important was the restoration of transparency in the facade and a view through the building.
During the re-branching, current users and functions were inventoried and examined whether they are housed in the right place in the building. The east wing, close to the connection to passenger traffic, offers the best opportunities for new retail functions. In the station hall, a smaller transfer function is combined with catering and retail functions such as a hairdresser. In the longer term, a redevelopment of the floors and west wing is possible for functions that are less ‘traveler dependent’. Examples include commercial rental of offices or perhaps unique destinations such as a museum, hotel or fitness center.
In the new design, the original structure of the building is restored architecturally. The cluttering and chambering of the interior is removed so that the original dimensions and heights become visible again. Non-original intermediate floors will be demolished. Facade openings are stripped of detonating changes and returned to the original layout as much as possible.
Restoring this facade image creates the possibility for each room unit to open access points to the square or to the platform. A special point of interest is that the layouts are authentic, but recognizable in detail as a contemporary modern addition. The history of the building is thus preserved. By dealing with the further layout in a smart way, the view from the city square to the stations and vice versa remains present.
Phase 1 of the renovation has now been completed. The renovation of the east wing, the middle part (former station hall) and part of the first floor are almost ready for further use for the various retail users. The rational constructive construction and facade layout have shown that the station building can be arranged flexibly, while preserving the monumental structure and within the existing rhythm of the facades.
With the interventions proposed by Ruland Architecten, the station building regains its prominent position as the heart of the station area, with an emphatically improved routing for travelers and visitors alike. With its renewed authenticity and retail functions, after more than 100 years, it is still a current and recognizable building for the city.
| Location | Zwolle, Nederland |
| Floor area | 2687 sq m gross floor area / fase 1 1398 sq m gross floor area |
| Year | 2015 – 2019 (design) 2020 – 2021 (construction phase 1) |
| Status | Completed (phase 1) |
| Client | NS Stations, Utrecht |
| Architect | Ruland Architecten, Amsterdam |
| Constructor | Royal Haskoning DHV, Utrecht |
| Installations adviser | Royal Haskoning DHV, Utrecht |
| Building physics adviser | Royal Haskoning DHV, Utrecht |
| Construction cost adviser | Bouwkostenbureau Heijneman, Nootdorp |
| Construction site management | NS Stations, Utrecht |
| Contractor | Koninklijke Woudenberg, Ameide |
| Building installations | Kropman Installatietechniek, Zwolle |
| Images | Ruland Architecten, Amsterdam |
| Photography (construction) | Ruland Architecten, Amsterdam |
| Photography | Jannes Linders, Rotterdam |
Interesting links
Here are some interesting links for you! Enjoy your stay :)Newsletter
Archive
- November 2025
- March 2025
- December 2024
- November 2024
- October 2024
- September 2024
- August 2024
- May 2024
- March 2024
- December 2023
- November 2023
- September 2023
- July 2023
- June 2023
- March 2023
- January 2023
- December 2022
- November 2022
- September 2022
- July 2022
- February 2022
- December 2021
- November 2021
- October 2021
- September 2021
- July 2021
- April 2021
- March 2021
- February 2021
- January 2021
- December 2020
- November 2020
- October 2020
- September 2020
- August 2020
- July 2020
- June 2020
- December 2019
- November 2019
- October 2019
- September 2019
- June 2019
- May 2019
- April 2019
- March 2019
- January 2019
- December 2018
- November 2018
- October 2018
- September 2018
- August 2018
- July 2018
- June 2018
- May 2018
- April 2018
- March 2018
- February 2018
- January 2018
- December 2017
- November 2017
- August 2017
- June 2017
- May 2017
- April 2017
- February 2017
- January 2017
- December 2016
- October 2016
- September 2016
- August 2016
- June 2016
- May 2016
- January 2016
- December 2015
- November 2015
- October 2015
- September 2015
- August 2015
- June 2015
- May 2015
- April 2015
- March 2015
- January 2015
- December 2014
- November 2014
- September 2014
- August 2014
- June 2014
- May 2014
- April 2014
- March 2014
- February 2014
- January 2014