Monumental balustrade reinforced

In order to preserve the monumental balustrade on platform 1 at The Hague HS station in both design and material, and at the same time to ensure that it meets the modern strength requirements, Ruland Architects has developed a reinforcement of the monumental balustrade in collaboration with Movares. Smederij Van der Vegt has made the adjustments and, after conservation, will install the balustrade on the spot where it was originally placed in 1892.