The basement is taking shape
The concrete formwork is placed in the right place. In the middle of next week, the walls can be poured. The lift point is already ready, as is the ascending reinforcement of the load-bearing inner wall.
The concrete formwork is placed in the right place. In the middle of next week, the walls can be poured. The lift point is already ready, as is the ascending reinforcement of the load-bearing inner wall.
The renovation and refurbishment of the Hotel Ibis Amsterdam Center has started. The breakfast room on the first floor will be merged with the restaurant on the ground floor. The foyer is enlarged, various seating areas connect the newly acquired open space. The hull design is by Ruland Architecten, the furnishing concept is by Phillip Watts Design (UK).
This week the basement has been largely excavated. The photo shows the contours of the lift pit and the thickened constructive floor strip. From here on they only build upwards.
The first foundation works for the new office villa of Breedband Arnhem started this week.
The work preparation for the office villa Breedband Arnhem has almost been completed and construction can begin. The location has been carefully cordoned off this week, the first groundworks have already been done.
Ruland Architecten has started the Design for a small restaurant in the Zandvoort station building. The restaurant is part of the ambition to enhance the original touristic character of the station building.
Ruland Architecten was commissioned by NS Stations to start with the architectural design for the redevelopment of the Zwolle station building.
The term ‘plasbrand (pool fire)’, the combustion of a puddle of burning liquid, has kept all parties quite involved in the commissioning of the new retail unit in the Rotterdam North station building. The building was designed in 1960 by architect S. van Ravenstein. Modern fire safety and escape routes were not sufficiently guaranteed in the exceptional situation of a ‘pool fire’. Because the building is now a national monument, the necessary interventions had to be applied with care and preservation of the original design and image.
Ruland Architecten has been asked to provide the consultancy work, to the necessary design work and to consult with the various municipal authorities involved. With the installation of a new escape staircase and adjustments to the existing walkways and steel frames, the station building has been adapted in an appropriate manner so that it complies with current legislation and regulations.
In localnewspaper “de Gelderlander”, region Arnhem, an article was published about over KantoorVilla Breedband Arnhem: a brief conversation with Dave Aaldering, entrepreneur of Arnhem 2017. OfficeVilla Breedband will soon becom the place of appointment for train passengers to and from Arnhem.
Read the article here (dutch only).
After an extensive renovation and redevelopement, the railwaystation building of Geldermalsen has been reopend this may 31st. It has been made suited for new use and combinations of new use such as hospitality business or offices.
The station reclaims its remarkable and prominent position as entrance to Geldermalsen as with the completion in 1886.