The basement is taking shape
The concrete formwork is placed in the right place. In the middle of next week, the walls can be poured. The lift point is already ready, as is the ascending reinforcement of the load-bearing inner wall.
The concrete formwork is placed in the right place. In the middle of next week, the walls can be poured. The lift point is already ready, as is the ascending reinforcement of the load-bearing inner wall.